Weightbridge Foundation Works in Progress – 19 March Update
Foundation construction for the weightbridge is underway, marking an important early stage of the project.
As of 19 March, DWASAL is actively progressing with foundation works for the weightbridge facility. The construction team is currently focused on preparing and strengthening the base, including ground leveling, reinforcement, and initial concrete placement.
This foundation stage is critical as it determines the strength, stability, and durability of the entire weightbridge structure, which is designed to support heavy truck loads.
Work is being carried out with close attention to engineering standards to ensure a solid and reliable base for the next phases of construction. The project team continues to operate efficiently despite site conditions, keeping the development on track.
DWASAL remains committed to delivering high-quality infrastructure that supports safe and effective operations.